Field Conversion Instructions

3
STEP 5
After the combustion test is complete, exit the System
Test mode and return to normal operation. Plug the test
port. For PVC and CPVC venting, use a standard 1/8"
NPT pipe plug. See Figure 5.
STEP 6
Place labels provided with the conversion instructions in
the proper locations.
Place the appropriate valve conversion label as close
to the adjusted gas valve as possible, inside the boiler
enclosure. See Figure 6.
Fill in required information on the appropriate boiler
conversion label. Place label next to rating label.
See Figure 7.
Figure 5
Figure 6
Figure 7
PUREFIRE
®
GAS CONVERSION KIT
It is extremely important that all enclosed conversion labels are placed in the proper locations shown. Not
following these instructions correctly could result in death or serious injury.
WARNING