Installation Guide

5
CONTEMPORARY WALL MOUNT TUB FAUCET (cont.)
Step 3: Rough-in #29 C-WLBO
flush to finished wall. Hot/Cold
supplies should be roughed
in on 8” centers and 1/2” pipe
should extend 3/8” to 1/2”
beyond the finished wall.
Step 4: Screw #28 decorative
flange included with C-WLBO
onto rough portion of #29.
Step 5: Attach faucet to wall by
screwing the union nuts onto the
C-WLBO wall elbows with #10
washers.
Step 6- Attach small end of #18 hand
shower hose with #30 washer to outlet below
diverter faucet handle.
Step 7- Attach large end of #18 hand shower
hose to #16 hand shower with #30 washer
and place in holder.
Step 8- Turn on water and check all
connections for leaks.
16
30
30
18
Finished Wall
C-FB1
3/8"-1/2"
C-WLBO (29)
Union Nut
Pipe Nipple
Decorative
Washer (10)
Flange (28)
Pipe
Finished Wall
Nipple
Decorative
Flange
1/2 - 14
NPT