Installation Guide

ENGLISH
ENGLISH
12
DRAIN BODY INSTALLATION
13
11
12 WATER SUPPLY CONNECTIONS
First, thread Inlet Connectors (12A) into Water Supply Lines (12B). Then, insert Inlet
Connectors (12A) into Valve Bodies (12C). Hot water supply lines go into left inlet.
Cold water supply lines go into right inlet. (Supply lines not included). Please follow
manufacturers instructions when installing supply lines. Next, insert Clips (12D) into
Valve Body Holes (12E), to secure unit.
WARNING: Do not twist Inlet Connectors (12A) once installed!
13 POP-UP INSTALLATION
Install and adjust Pop-Up (13A) using separate instructions supplied with the Pop-Up
assembly.
11 HOSE CONNECTION
From underneath sink, push Center Connector (11A) onto receiving Tube (11B), until
unable to push any further. Pull down on Center Connector (11A). If the housing and
the Inner Collet (11C) separate slightly but do not pull off receiving Tube (11B), the
connection is secure.
To remove, push up on Center Connector (11A) holding plastic Collet (11C) in place,
pull down on Center Connector (11A) until Tube (11B) is free.
Slide the End Connectors (11D) with arrow (11E ) pointing up onto the Valve Bodies (11F ).
Push the End Connectors (11D) all the way up until completely seated. Be careful not
to damage O-Rings (11G).
4
HOT
COLD
13A
12A
12D
12D
12E
12D
12A
12B
12B
12C
12C
11B
11A
11D
11F
11F
11F
11G
11G
11E
11D
11B
11D
11E
11A
11B
11A
11C
11B
11C