Integrators' Reference Manual for For ViewStation EX, ViewStation FX, and VS4000

Integrators’ Reference Manual for ViewStation EX, ViewStation FX, and VS4000
96 www.polycom.com
Placing Test Calls
To verify that you have installed the endpoint equipment correctly,
test each unit as follows:
Place an ISDN call from the unit.
Place an IP call from the unit.
From a suitable endpoint, place an ISDN call to the unit.
From a suitable endpoint, place an IP call to the unit.
If you are able to complete all calls successfully, the unit is ready for
use.