Installation Guide

16
INSTALLATION CHECKLIST
Water Heater Location
Centrally located with the water piping system.
Located as close to the gas piping and vent pipe
system as possible.
Located indoors and in a vertical position. Protected
from freezing temperatures.
Proper clearances from combustible surfaces
maintained and not installed directly on a carpeted
oor.
Provisions made to protect the area from
water damage. Drain pan installed and piped to an
adequate drain.
Installation area free of corrosive elements and
ammable materials.
• Suf cient room to service the water heater.
Water heater not located near an air-moving device.
Gas Supply and Piping
Gas supply is the same type as listed on the water
heater data plate.
Gas line equipped with shut-off valve, union, and
drip leg.
Approved pipe joint compound used.
Adequate pipe size and of approved material.
Chloride-free soap and water solution or other
approved means used to check all connections and
ttings for possible gas leaks.
Combustion Air Supply/Vent Pipe System
Sufficient fresh air supply for proper water heater
operation.
Fresh air not taken from areas that contain negative
pressure producing devices such as exhaust fans,
replaces, etc.
Fresh air supply free of corrosive elements and
flammable vapors.
Fresh air openings sized correctly with consideration
given to the blocking effect of louvers and grilles.
Ductwork is the same cross-sectional area as the
openings.
Vent pipe and fittings of approved material.
Acceptable size, length, and number of elbows on
exhaust outlet pipe.
Installed in accordance with prevailing provisions of
local codes, or in the absence of such, National Fuel
Gas Code, NFPA 54, ANSI Z223.1-Current edition.
Slope 2” & 3” horizontal piping at a downward pitch
of 1/8” per 5ft. away from the water heater.
Not obstructed in any way.
Vent Termination
Horizontal
12” Min. above grade/snow level.
Slope 2” & 3” horizontal piping at a downward pitch
of 1/8” per 5ft. away from the water heater.
Away from corners, other vents, windows, etc.
Vertical
Outlet - 12” Min. above roof/snow level.
Water System Piping
Temperature and pressure relief valve properly
installed with a discharge line run to an
open drain and protected from freezing.
All piping properly installed and free of leaks.
• Heater completely lled with water.
Closed system pressure build-up precautions
installed.
Tempering valve installed per manufacturer’s
instructions.
Electrical Connections
Unit connected to a dedicated power supply.
Unit connected to a 120V electrical supply.
• Proper polarity.
Water heater properly grounded.
Installed in accordance with prevailing provisions of lo-
cal codes, or in the absence of such, the current edition
of the National Electric Code, ANSI/NFPA 70.