36” Wide Upper Wall Cabinet DATE STAMP Assembly Instructions Model # GSUW-0708-1 CONTACT US FIRST parts@prepacmfg.com 1-877-PREPAC1 1-877-773-7221 Mon - Fri • • 7am - 4pm PST 10am - 7pm EST For help with assembly If you have received a damaged or defective part or are missing hardware. We will process replacement parts in 2 business days or less. Parts are shipped via UPS Ground or mail. Before you call please: 1) Record the following information from the shipping label on the outside of the box.
Cabinet Parts C1 C1 Top / Bottom (2)* Dessus / Bas TP-10052-G gray / gris C2 Left Side (1) Côté gauche SL-10055-G gray / gris C4 C3 Center Gable (1) Pignon central GA-10056-G gray / gris C5 C3 C4 C6 C5 Right Side (1) Côté droit SR-10055-G gray / gris C5 C2 C6 C1 Adjustable Shelves (2) étagère ajustable SF-10040-G gray / gris C6 Doors (2) porte DR-10036-G gray / gris *In the assembly steps, this part is called Top or Bottom depending on where it is attached.
BEFORE YOU BEGIN AVANT DE COMMENCER Identify ALL parts and hardware to ensure everything is included. Identifier toutes les pièces et le matériel afin de s’assurer que tout est inclus.
1 Attach Rail Hooks to the Gable (C3) as shown. Use wrench to tighten nuts. Fixez les crochets de suspension au pignon comme montre.
2a Attach Rail Hooks to the Left (C2) & Right (C4) Sides as you did in Step 1. Use wrench to tighten nuts Fixez les crochets de suspension ����������������� aux côtés gauche (C2) ����� et ������������� de droite (C4) ����� comme ������������ étape 1.
3 Attach Top (C1) to Left (C2) and Right (C4) Sides and Center Gable (C3) with Confirmat Screws Fixez le dessus (C1) aux côtés gauche (C2) et droit (C4) et au pignon central (C3) avec les Vis Confirmat C4 C1 C3 C2 Confirmat Screw Vis Confirmat Page of 20
4a Attach Bottom (C1) to Left (C2) and Right (C4) Sides and Center Gable (C3) with Confirmat Screws Fixez le bas (C1) aux côtés gauche (C2) et droit (C4) au pignon central (C3) avec les Vis Confirmat C4 C3 C2 C1 Confirmat Screw Vis Confirmat Page of 20
5a Attach hinges to doors (C6) with the #6 - 5/8” Wood Screws Fixez les charnières de portes (C6) avec vis de bois no. 6 5/8 po. #6 - 5/8” Wood Screws Vis de bois no. 6 5/8 po. C6 5b Attach hinges to doors (C6) with screws provided. Do not attach doors to cabinets yet. Fixez les poignées de portes (C6) avec les vis fournies. Ne fixez pas les portes d’armoires encore.
Installing Hang Ups Garage Cabinets 2 people required Read through all installation steps before beginning ONLINE HELP Pour suspendre les armoire au mur, vous aurez besoin de 2 personnes Lisez bien toutes les étapes de cette installation avant d’entamer la tâche. L’AIDE EN LIGNE To see a how-to installation video, click on “How to Install Prepac’s Garage Storage Collection” on the Assembly page in the Support section of our website: www.prepacmfg.
Hanging a Single 36” Cabinet Accrocher une seule armoire 36 po. If you are installing one cabinet only, make sure the metal rail covers 3 studs and center the cabinet across the studs. Si vous installez un seul cabinet uniquement, assurez-vous que le rail métallique couvre 3 goujons et centre le cabinet partout les goujons.
Hanging Multiple Cabinets Pour suspendre plusieurs armoires We will illustrate how hang multiple cabinets using the sample configuration below. Nous allons illustrer comment accrocher plusieurs armoires à partir de l’exemple de configuration ci-dessous. 1. On your wall, mark where the cabinets will be positioned with tape or a pencil 2. Determine the number of Metal Rails and Connecting Braces needed. You may not need all rails 3.
The illustration below shows where the Metal Rails & Connecting Braces should be attached to the wood studs for this configuration L’illustration ci-dessous montre où les rails métalliques & la connexion les accolades ne doivent être connectés au bois goujons pour cette configuration NOTE: Rails and Braces are shown ABOVE cabinets for clarity REMARQUE : Les rails et les accolades sont indiqués ci-dessus les armoires pour plus de clarté 1/8” 1/8” 1/8” For the Base Cabinets, cut BOTH METAL RAILS.
Installing Hang Ups Garage Cabinets Installation “Hang Ups” Garage armoires 1 Measure 79½ inches from the floor and make multiple marks along the wall Mesurer 79½ pouces du sol et faire plusieurs repères le long du mur 79½” 2 With a level, connect the marks Avec un niveau, connectez les marques Page 13 of 20
3a Find the center of the wall studs and mark the location of each stud along the line. Studs are typically 16 inches apart center to center. Trouver le centre du mur et marquer l’emplacement de chaque goujon le long de la ligne. Les goujons sont généralement de 16 centimètres l’un de l’autre centre à centre. 3b Using a 3/16th inch drill bit, pre-drill holes 3 inches deep at the locations you had marked.
4 Hang the First Rail Accrocher la première position de Rail Position the Metal Rail over the pre-drilled holes and insert wood screws into the first & second holes. Tighten screws with the Allen Key provided. Positionnez la piste de métal sur les trous pré-percés et insérez les vis à bois dans le premier & deuxième trous. Serrer les vis avec la clef Allen fournie.
6 Hanging the Second Rail Accrocher le deuxième position de Rail Slide the second Metal Rail BEHIND the Connecting Brace Faites glisser le Rail Métallique deuxième derrière le connectant le renfort Secure the Connecting Brace to the Second Rail Sécuriser la connexion renfort pour le deuxième rail Page 16 of 20
7 Carefully hang the cabinet onto the Metal Rail until it locks into place. Laisser pendre soigneusement le cabinet sur la rail métallique jusqu’à ce qu’elle se verrouille en place. Make sure the Rail Hook slides fully into the notch on the Metail Rail Track. Assurez-vous que le crochet de Rail de diapositives pleinement dans l’encoche du Metail voies de chemin de fer.
8 Insert metal dowel pins and add adjustable shelves Insérer les Goujons de métal et ajouter étagères ajustable 9 Attach doors Fixez les portes Page 18 of 20
Hinge Adjustments Hinges are 6-way adjustable, allowing you to make precise adjustments. Ajustements de charnière Les charnières sont 6-voies réglables, vous permettant d’effectuer des réglages précis. Vertical Door Alignment: Loosen the top & bottom Hinge Plate Screws (on both hinge sets) and move the door up or down. Alignement de la porte verticale: desserrer le haut & bas plaque charnière vis (sur les deux charnières) et déplacer la porte vers le haut ou vers le bas.
Give Us Your Feedback CALL US 1-877-PREPAC1 (1-877-773-7221) Mon - Fri 7am - 4pm PST 10am - 7pm EST Email Us: assembly@prepacmfg.com Thanks! Faites-nous part de vos commentaires Écrivez-nous à : assembly@prepacmfg.