Instruction manual

INSTALLATION (Continued):
Wiring:
2) Remove front cover of the control side of the cabinet by loosening the cover
mounting screws.
3) Cut a hole in the top of the enclosure for the incoming power supply to allow for the
power supply to enter the top of the enclosure.
4) Fuse the incoming line for the rated amperage using an approved electrical
disconnect box.
5) Connect the leads from the incoming power line to the appropriate terminals
(reference the Electrical Schematic) making sure not to disturb existing wiring. Use
care that no loose strands of wire are exposed out of the terminal connection.
Torque all wires to the specified ratings located on the wiring diagrams and
component labels.
TORQUE SPECIFICATIONS
CIRCUIT BREAKER
DISTRIBUTION BLOCK
PRIMARY:
SECONDARY:
SECONDARY:
POWER FUSES
SAFETY CONTACTOR
SOLID STATE RELAYS
INPUT :
OUTPUT :
Figure 9: Torque Specifications Label
6) Grounding is done internally from the Incoming Power Strip.
M-45-02 TYTAN Manual
Revision - Date: 01 – 11/16/07
21