Installation Guide

Installation
Valve Installation/Replacing Existing Valve
1. TURN OFF WATER SUPPLY TO SHOWER. Typically there is a gate valve where the water main enters the
house.Turningthewatervalveoathotwatertankdoesnotturnocoldwatersupplyline.
2. Makecertainwateriscompletelyturnedotobothhot&coldsupplylinesofshower.Turnshowervalve
on, both hot and cold, to VERIFY WATER SUPPLY IS OFF. Open a sink faucet in bathroom in which you are
installing valve to relieve any pressure and help adequately drain shower supply lines.
3. Remove handle(s) and trim cover(s) of your existing shower valve, exposing valve body in wall.
4. Locate hot and cold supply lines entering valve. Using a reciprocating saw with sharp metal saw blade and cut
existing valve out. You should also cut riser within wall supplying existing shower head. Carefully twist and
remove valve.
5. Install valve, MAKING SURE WATER POWERED GENERATOR AND "UP" OUTLET IS FACING UP and secure
towallframingwithscrews(notincluded).Plasterguard(19)mustbeushwithnishedwallfor
proper positioning. Connect water supplies to valve (hot water to left side and cold water to right side).
Use thread seal compound or plumber's tape on all threaded connections to prevent leaks.
Somesolderingofjointsandttingsmaybenecessaryforcopperpipes.
6. Connect riser pipe and tub spout outlet plumbing. If you have a shower only model, you will need to cap
valve's tub outlet with supplied cap (20). Likewise if you have a tub only model, you will need to cap valve's
showeroutlet.Donotattachshowerheaduntilafterushingtheshower'sriserpipe.
7. Step 1: Remove black gasket (28).
Step 2: Lift to release side lock and separate LED box and snap on LED housing (30).
Step 3: From the front of the trim (18) insert connector cable (29) and LED display (26)
through the trim LED window. NOTE: Make sure the circles on the LED Display (26) are facing down.
Step 4: Place gasket (28) on the back of the trim (18) onto LED display (26).
Step5: Place snap on LED housing (30) onto LED display (26) through the back and snap on to lock in place.
Step 6: Connect LED display (26) to water power generator (24) on valve.
8. Remove plaster guard (19). Install nylon friction ring (17) and wall gasket (21) to trim plate (18). Align trim
plate with LED display and slide over valve assembly. Install handle (14) and tighten set screw (15).
NOTE: Make sure you follow the UP and DOWN arrows on the valve body (1) for correct placement.
000
Cold water at 78°F and below
Warm water at 79°F to 96°F
Hot water at 97°F and above