Technical Manual

37
Utilize holiday list maintenance tool bar to construction holiday
It is need to set holiday’s name, holiday dates and holiday lengths.
3.1.9 Leave style setting
Click ‘leaving setting’ in down-drag menu, the following window
pop up.
Utilize the tool bar to add, delete, and modify leave style as well as
utilize account rule to set leave record rule, not only set to control leave
give up or count, but also set the symbol in record list.
3.1.10 Attendance rule
Select maintenance /setup menu, click ‘attendance rules,’ option, and
this window will pop up