Installation Sheet

1of2
Package Contents
A
Mounting Screw
x3
Fixture Hood
Assembly
x1
Glass Shade
x1
C
Lock Screw
x2
STEP 2 - Mark the Location for the 3 Mounting Holes
A. Place the light fixture onto the post and mark the location of the 3
mounting holes on the fixture fitter onto the post with the marking
pen.
Fixture
Fitter
Marking Pen
Mounting Hole
Post
Lighting
Post
Post
Fixture
Fitter
Figure 2
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
Pleasegoto forproductcleaningtips.Gotothe selection.
(1)A21MediumBaseBulb150WMaximum,MediumBaseVintageBulbisrecommended,bulbnotincluded.
20-30minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtoensureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.
www.quoizel.com Care+Maintenance
LightSource:
EstimatedAssembly Time:
Preparation:
ToolsRequired:Flatheadscrewdriver,Phillipsscrewdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
MissingParts?Contactyouroriginalplaceof
purchase.
E
Fixture Body
x1
D
STEP 1 - Install Bulb, Glass
Shade and Fixture Hood
Assembly
A. Insert the bulb onto the socket
and screw snugly into place.
B. Place the Glass Shade (E) onto
the glass holder. Place the
Fixture Hood Assembly (C) onto
the Glass Shade (E) and align
holes on side arms to mounting
holes on the side of the glass
holder. Secure them together by
threading Lock Screws (D) into
mounting holes on the glass
holder. Hand tighten until snug.
B
Side Arm
E
D
C
B
Socket
Vintage Bulb
(recommended
but not supplied)
Figure 1
STEP 4 Drill Holes-
A. Using the 1/16” bit and drill, drill a pilot hole completely through the
post at each (3) locations marked in step 3 above.
1/16” bit and drill
Post
Figure 4
STEP 3 M C E M H- arking the enter of ach ounting ole
A. Remove the light fixture. Using the center punch and hammer
marking the center of each mounting hole location that is marked
with the marking pen.
Center Punch
Hammer
Marking
Post
Figure 3
Glass Holder
Installation Guide #IS-EXH9008EK
For Style EXH9008EK
2018 QuoizelInc.
ReleasedDate:2018-03-28
visit us on-line at www.quoizel.com

Summary of content (2 pages)