Installation Sheet

1of2
For Style MRG635EK
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
Pleasegoto forproductcleaningtips.Gotothe selection.
(6)B10CandelabraBasebulbs60WMaximum,bulbnotincluded.
MinimumHangingHeightis23”,MaximumHangingHeightis72.5”.
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtoensureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.MissingParts?Contactyouroriginalplaceof
purchase.
www.quoizel.com Care+Maintenance
LightSource:
FixtureHangingHeight:
EstimatedAssemblyTime:
Preparation:
ToolsRequired: Flathead screwdriver, Phillips screwdriver, pliers, wire cutters, wire strippers, electrical tape, safety glasses.
Installation Guide #IS-MRG635EK
2018 QuoizelInc.
visit us on-line at www.quoizel.com
Package Contents
Hardware Contents
AA
Crossbar
x1
Assembly
Ceiling Canopy
x1
CC
DD
Quick Link
x4
B
A
Fixture Body
x1
STEP 2 - Install the Crossbar Assembly to Outlet Box and Adjust
the length of the Nipple
A. Attach the Crossbar Assembly (A) to the Outlet Box with the head
of the Green Ground Screw facing you. Secure it with Outlet Box
Screws (not included), tighten until snug
B. Adjust the hex nut and lock washer underside of the crossbar to the
middle of the nipple.
C. Remove the and Hex Nut from the Nipple. Place the
Ceiling Canopy over the Nipple against the ceiling to determine the
correct position of the nipple. Thread the Finial onto the Nipple.
Adjust the nipple to allow the Ceiling Canopy to rest against the
ceiling when held in place by the .
D. Remove the and the Ceiling Canopy (DD). Tighten the
lock washer and the hex nut against the crossbar to secure in
place.
.
Lock Ball
Lock Ball
Lock Ball
Outlet Box Screw
(not included)
Green Ground Screw
Hex Nut and
Lock Washer
Outlet Box
Lock Ball
Figure 2
Nipple
Hex Nut
CC
AA
STEP 3 - Install Fixture Chains
A. Adjust the Fixture Chain (BB) to your desired length by removing the
links if needed.
B. With the Fixture Chain (BB) not attached to the fixture loops and the
ceiling loops underside of the Ceiling Canopy (DD), pull the supply
wires and ground wire through the Fixture Chain (BB) alternating
links. After the wires are through the Fixture Chain (BB), pull the
supply wires and ground wire through the Ceiling Canopy (DD).
C. Attach one ends of the Fixture Chains (BB) to fixture loops with two
Quick Links (CC) as shown. Lift the fixture and Fixture Chains (BB)
up and attach the other ends of the Fixture Chains (BB) onto the
ceiling loops underside of the Ceiling Canopy (DD) with the rest two
Quick Links (CC).
Suggested rods and chain length for Ceiling height :
8’ ceiling : use 10 links of chains and 4 quick links
9’ ceiling : use 20 links of chains and 4 quick links
10’ ceiling : use 30 links of chains and 4 quick links
Supply Wires
and Ground Wire
CC
CC
BB
DD
BB
Fixture Chain
x2
Fixture Loop
ReleasedDate:2018-08-27
Arm
x1
Assembly
A
B
STEP 1 - Install the Arm Assembly
a. Attach the hook on the other end of the Arm (A) to the loop at the
inside of the Fixture Body (B).

Summary of content (2 pages)