Installation Guide

ToolsRequired:Flatheadscrewdriver, Phillips screwdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
BulbRecommended:
EstimatedAssemblyTime:
Preparation:
(9)CandelabraBase60WMaximum.
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomer service for replacement
parts.
Warnings and Cautions
1of2
Assembly Instruction Sheet #IS-NBE5009RK
For Style NBE5009RK
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,.
..
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700
or visit us on-line at www.quoizel.com
2014 QuoizelInc.
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.
September2014
Package Contents
Hardware Contents
AA
BB
CC
DD
EE
FF
II
Crossbar
x1
Lock Washer
x2
Hex Nut
x2
Nipple
x1
Canopy
Chain Loop
x1
Canopy Lock
Ring
x1
Ceiling
Canopy
x1
GG
Fixture Chain
x1
HH
Quick Link
x2
STEP 1 Install Crossbar-
A. AA)Attach the Crossbar ( to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included) Tighten until snug..
Figure 1
Outlet Box
Outlet Box Screw
(not included)
Green Ground
Screw
AA
Nipple (DD). By using pliers,
thread the Hex Nut (CC)
against the Canopy Chain
Loop (EE) and hand
tighten until snug.
B. Thread another Hex Nut
(CC) to the middle of the
Nipple (DD). Place
another Lock Washer (BB)
over the Nipple (DD) and
then thread the Nipple
(DD) into the Crossbar
(AA) until the Nipple (DD)
is about 0.375” above the
Crossbar (AA).
C. Remove the Canopy Lock
Ring (FF) from the Canopy
Chain Loop (EE). Place
the Ceiling Canopy (II)
over the Canopy Chain
Loop (EE) against the
AA
BB
CC
Step B
Step A
DD
CC
BB
EE
II
FF
STEP 2 Install Canopy Chain Loop and Nipple-
* Pliers is required for this step.
A. Thread one Hex Nut (CC) to one end of the Nipple (DD) until it is at
least 0.25” from the end. Pass one Lock Washer (BB) over the end
of the Nipple (DD) and thread the Canopy Chain Loop (EE) onto the
STEP 3 Install Stem, Fixture Body,
Side Arm and Socket Assembly
together
-
A. Pull slack wires and ground wrie
between stem and Socket
Assembly (C) out of fixture loop.
Only pull the wire with label
Please Pull This Wire First When
you Assembly” since the another
one is fixed.
B. Thread Socket Assembly (C) onto
theStemontheFixtureBody(B),
hand tighten until sung.
C. Attach have one loop end of Side
Arm (A) onto the hook on the top of
Fixture Body (B), have two loops
end of Side Arm (A) onto the lower
hook on the Fixture Body(B).
D. Thread Finial (D) onto the nipple on
the bottom of Fixture Body (B),
hand tighten until sung.
Figure 3
ceiling to determine the correct position of the Nipple (DD). Thread the
Canopy Lock Ring onto the Canopy Chain Loop (EE). Adjust the
Nipple (DD) to allow the Ceiling Canopy (II) to rest against the ceiling
when held in place by the Canopy Lock Ring (FF).
D. Remove the Canopy Lock Ring (FF) and the Ceiling Canopy (II).
Tighten the Hex Nut (CC) against the Crossbar (AA) to secure in
place.
Figure 2
B
Fixture
Body
x1
Side Arm
x5
A
Finial
x1
D
Socket
Assembly
x1
C
A
D
C
Stem
B
Please pull this wire first
when you assembly.

Summary of content (2 pages)