Installation Sheet

1of2
Assembly Instruction Sheet #IS-SHR5005RK
For Style SHR5005RK
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,.
..
Package Contents
Hardware Contents
AA
BB
CC
DD
EE
FF
II
Crossbar
x1
Lock Washer
x2
Hex Nut
x2
Nipple
x1
Canopy
Chain Loop
x1
Canopy Lock
Ring
x1
Ceiling
Canopy
x1
GG
Fixture Chain
x1
HH
Quick Link
x2
Pleasegoto forproductcleaningtips.Gotothe selection.
(5)B10CandelabraBaseBulbs60WMaximum.
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
www.quoizel.com Care+Maintenance
LightSource:
EstimatedAssemblyTime:
Preparation:
ToolsRequired: Flathead screwdriver,Phillipsscrewdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
2017 QuoizelInc.
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-800-645-3184
or visit us on-line at www.quoizel.com
Fixture Loop
x1
A
STEP 1 Install Fixture Loop-
A. Thread the Fixture Loop (A) onto the
top center of the Fixture Body (B).
Hand tighten until snug.
ReleasedDate:2017-09-18
Fixture Body
x1
B
A
B
Figure 1
STEP 2 Install the Crossbar to the junction box-
.
A. Attach the Crossbar (AA) to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included), tighten until snug
Figure 2
Outlet Box
Outlet Box Screw
(not included)
Green Ground
Screw
AA
STEP 3 Install the Canopy Chain Loop and Nipple-
A. Thread one Hex Nut (CC) to one end of the Nipple (DD) until it is at
least 0.25” from the end. Pass one Lock Washer (BB) over the end
of the Nipple (DD) and thread the Canopy Chain Loop (EE) onto the
Nipple (DD). By using pliers, thread the Hex Nut (CC) against the
Canopy Chain Loop (EE) and hand tighten until snug.
B. Thread another Hex Nut (CC) to the middle of the Nipple (DD).
Place another Lock Washer (BB) over the Nipple (DD) and then
thread the Nipple (DD) into the Crossbar (AA) until the Nipple (DD)
is about 0.375” above the Crossbar (AA).
C. Remove the Canopy Lock Ring (FF) from the Canopy Chain Loop
(EE). Place the Ceiling Canopy (II) over the Canopy Chain Loop
AA
BB
CC
Step B
Step A
DD
CC
BB
EE
II
FF
Figure 3
(EE) against the ceiling to
determine the correct
position of the Nipple (DD).
Thread the Canopy Lock
Ring onto the Canopy
Chain Loop (EE). Adjust the
Nipple (DD) to allow the
Ceiling Canopy (II) to rest
against the ceiling when
held in place by the Canopy
Lock Ring (FF).
D. Remove the Canopy Lock
Ring (FF) and the Ceiling
Canopy (II). Tighten the
Hex Nut (CC) against the
Crossbar (AA) to secure in
place.

Summary of content (2 pages)