Installation Guide

Pleasegoto forproductcleaningtips.Gotothe selection.
(3)B10CandelabraBase60WMaximum.
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtobesureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.Contactcustomerserviceforreplacement
parts.
www.quoizel.com Care+Maintenance
LightSource:
EstimatedAssemblyTime:
Preparation:
ToolsRequired:Flatheadscrewdriver, Phillips screwdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
Warnings and Cautions
1of2
Assembly Instruction Sheet #IS-SLT5303IF
For Style SLT5303IF
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
,.
..
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700
or visit us on-line at www.quoizel.com
2015 QuoizelInc.
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.
Package Contents
Hardware Contents
AA
BB
CC
DD
EE
FF
Crossbar
x1
Lock Washer
x2
Hex Nut
x2
Nipple
x1
Canopy
Chain Loop
x1
Canopy Lock
Ring
x1
Ceiling Canopy
x1
HH
Quick Link
x2
STEP 1 Install Fixture Loop-
A. Thread the Fixture Loop (A) onto the top
end of the Fixture Body (B). Hand tighten
until snug.
Figure 1
A
Fixture Loop
x1
D
3” Drop
x3
April2015
B
Fixture
Body
x1
C
Crystal Drop
x6
A
B
Figure 2
Outlet Box
Outlet Box Screw
(not included)
Green Ground
Screw
AA
E
2.5” Drop
x3
F
3” Drop with
7 Beads
x1
G
3” Drop
with 8
Beads
x3
II
GG
Fixture Chain
x1
STEP 2 Install Crossbar-
A. AA)Attach the Crossbar ( to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included) Tighten until snug..
STEP 3 Install Canopy Chain Loop and Nipple-
* Pliers is required for this step.
A. Thread one Hex Nut (CC) to one end of the Nipple (DD) until it is at
least 0.25” from the end. Pass one Lock Washer (BB) over the end of
the Nipple (DD) and thread the Canopy Chain Loop (EE) onto the
Nipple (DD). By using pliers, thread the Hex Nut (CC) against the
Canopy Chain Loop (EE) and hand tighten until snug.
B. Thread another Hex Nut (CC) to the middle of the Nipple (DD). Place
another Lock Washer (BB) over the Nipple (DD) and then thread the
Step B
Step A
CC
BB
EE
II
FF
AA
BB
CC
DD
Figure 3
Nipple (DD) into the Crossbar
(AA) until the Nipple (DD) is
about 0.375” above the
Crossbar (AA).
C. Remove the Canopy Lock
Ring (FF) from the Canopy
Chain Loop (EE). Place the
Ceiling Canopy (II) over the
Canopy Chain Loop (EE)
against the ceiling to
determine the correct position
of the Nipple (DD). Thread the
Canopy Lock Ring onto the
Canopy Chain Loop (EE).
Adjust the Nipple (DD) to
allow the Ceiling Canopy (II)
to rest against the ceiling
when held in place by the
Canopy Lock Ring (FF).
D. Remove the Canopy Lock
Ring (FF) and the Ceiling
Canopy (II). Tighten the Hex
Nut (CC) against the Crossbar
(AA) to secure in place.
STEP 4 - Install Fixture Chain and Ceiling Canopy
A. Adjust the Fixture Chain (GG) to your desired length by removing
the links if needed.
Pliers is required for this step.
B. With the Fixture Chain (GG) not attached to the Fixture Loop and the
Canopy Chain Loop (EE), pull the supply wires through the Fixture
Chain (GG) alternating links. After the wires are through the Fixture
Chain (GG), pull the Supply Wires and the Ground Wire through the
Canopy Lock Ring (FF) and the Ceiling Canopy (II) in order.
C. Attach one end of the Fixture Chain (GG) to the Fixture Loop with
one Quick Link (HH). Lift the fixture and Fixture Chain (GG) up and
attach the other end of the Fixture Chain (GG) onto the Canopy
*

Summary of content (2 pages)