User`s guide

INSTALLATION
Eaton 5125 Rack-Mount UPS (5000/6000 VA) User's Guide S 164201541 Rev D
www.eaton.com/powerquality
22
Position 1
Position 6
Position 10
Position 15
First Rail
Second Rail
Figure 3. Front Rail Screw Positions
3. Secure the rail to the front of the rack with two hex-head screws
(see Figure 4).
Front Rail Hex-Head Screws
Figure 4. Securing the Front Rail