User`s guide

INSTALLATION
Eaton 5125 Rack-Mount UPS (5000/6000 VA) User's Guide S 164201541 Rev D
www.eaton.com/powerquality
24
5. Repeat Steps 3 and 4 for the other rail.
6. Tighten the assembly wing nuts on both rail assemblies.
7. Place the UPS on a flat, stable surface with the front of the UPS
facing toward you.
8. Align the mounting brackets with the screw holes on the sides of
the UPS and secure with the supplied #6-32
3/8 flat-head screws
(see Figure 7).
9. If installing optional EBMs, repeat Steps 7 and 8 for each cabinet.
Mounting Bracket
Figure 7. Installing the Mounting Brackets