User`s guide

INSTALLATION
Eaton 5125 Rack-Mount UPS (5000/6000 VA) User's Guide S 164201541 Rev D
www.eaton.com/powerquality
26
12. Attach the rear hold-down bracket to the rail and slide the bracket
into the slots on the UPS rear panel. Repeat for the other side.
Verify each rear hold-down bracket is fully seated and then tighten
the wing nut. The UPS is now secured in the rack.
13. If installing optional EBMs, repeat Step 12 for each cabinet.
Rear Hold-Down
Bracket
Figure 9. Securing the Back of the UPS
14. Continue to the following section, “Installing the UPS Internal
Batteries.”