User`s guide

INSTALLATION
Eaton 5125 Rack-Mount UPS (5000/6000 VA) User's Guide S 164201541 Rev D
www.eaton.com/powerquality
37
13. Switch all battery circuit breakers to the ON position.
14. If an emergency power-off (disconnect) switch is required by local
codes, see “Remote Emergency Power-off Installation” on page 30
to install the REPO switch before powering on the UPS.
15. Switch the main utility breaker on.
The
indicator flashes, indicating the UPS is in Standby mode
with the equipment offline.
16. Press and hold the On
button for approximately three seconds.
The
indicator illuminates solid and the load level indicators
display the percentage of load being applied to the UPS. The UPS is
now in Normal mode and supplying power to your equipment.
If the alarm beeps or a UPS alarm indicator stays on, see Table 10
on page 66.
To change the factory‐set defaults, see “Configuration” on page 43.
17. If you installed an optional REPO, test the REPO function:
Activate the external REPO switch.
De-activate the external REPO switch and restart the UPS.
18. If optional EBMs are installed, continue to “Configuration” on
page 43 to specify the number of EBMs installed.
NOTE The batteries charge to 80% capacity in approximately 3 hours. However, it is
recommended that the batteries charge for 48 hours after installation or long-term storage.