Installation Guide

2" Spacer Blocks
1
2
3
T-Top Railing
Installation Instructions
WARNING:
Improper installation of this product can result in personal injury. Always wear safety goggles when cutting, drilling and assembling the product.
Incorrect installation may cause harm to the product or individual.
TM
Post Installation:
Closely follow Post Install Kit installation instructions or use a Post Sleeve over an existing wood 4x4.
Cut Rails to Length:
a. Place bottom rail across post opening leaving equivalent spacing from the last baluster and post on
each end (Fig. 1).
b. Mark
1
8" from end of post to allow room for expansion (Fig. 2).
c. Align top rail with bottom rail and cut both rails with miter box or hacksaw (see saw blade
manufacturer's specs for correct blade) (Fig. 3).
NOTE:
You will have to cut through an aluminum insert in each rail.
Spacer Blocks:
Cut two 2" temporary wood spacer blocks (not included) to
insert under ends of railing sections to temporarily assist in
aligning railing section (Fig. 4).
34115554
LEVEL RAIL INSTALLATION:
Fig. 2
Fig. 3
Fig. 1
Fig. 4
03/05/197830 Freeway Circle, Middleburg Hts, Ohio 44130 | 1-877-265-2220 | barretteoutdoorliving.com

Summary of content (12 pages)