Instructions / Assembly
7
3 - RESIDENTIAL APPLICATIONS - WOOD FRAMING
3.1 Typical Residential Wall
Application Method A
1. Measure working area where
Reective Air will be applied.
2. Fasten the Reective Air to the stud
facing using 1/2” staples every 4” - 6”.
3. The white polyethylene side of the
Reective Air should be facing the
mass insulation.
4. Apply 1 x 3 strapping running
horizontally (at 16” on centre) to the
Reective Air, running the length of
the wall.
5. Ensure that all seams are securely taped using reective tape.
6. Fasten the interior nish to the strapping using approved construction methods.
NOTE: This installation method will decrease sound transmission
3.2 Typical Residential Wall
Application Method B
1. Apply 1 x 3 strapping running
horizontally (at 16” on centre) to the
stud facing, running the length of
the wall.
2. Measure working area where
Reective Air will be applied.
3. Fasten the Reective Air to the stud
facing using 1/2” staples every 4” - 6”.
4. Ensure that all seams are securely
taped using reective tape.
5. Apply 1 x 3 strapping running vertically (at 16” on centre) on top of the Reective Air,
running the length of the wall.
6. Fasten the interior nish to the strapping using approved construction methods.
EXTERIOR FINISH*
6” MASS INSULATION
STRAPPING HORIZONTAL
1”x3” AT 16” O.C.
AIRSPACE
SHEATING AND
AIR BARRIER
INTERIOR FINISH
Reflective Air
TAPE ALL SEAMS
EXTERIOR FINISH*
6” MASS INSULATION
STRAPPING HORIZONTAL
1” x 3” AT 16” O.C.
AIR SPACE
INTERIOR FINISH*
TAPE ALL SEAMS
SHEATING AND
AIR BARRIER
*According to Wall Design
Reflective Air