Installation manual

Regency I2400M
9
INSTALLATION
 Positive Flue
Connection
with Cleanout


Package contains: 3 brackets and 6 screws.
These brackets are to be used to hold the ue
liner (not supplied) to the Insert and keep the
connection. The brackets are screwed into the
top of the Insert in the pre-punched holes and
then screwed into the ue liner.


The insert must be installed as per the require-
ments of your local inspection authority. Three
methods of ue connection are acceptable in
most areas in the US, however 

 Positive ue connection, where a large
blocking plate and a short connector pipe
is used.
 Direct ue connection, where a smaller
blocking plate and a connector pipe to the
rst ue liner tile is used.
 Full ue liner, where a stainless steel rigid
or exible liner pipe is routed from the insert
outlet collar to the top of the chimney.
Regency highly recommends the use of a full
liner as the safest installation and provides the
most optimum performance. Your retailer should
be able to help you decide which system would
be the best for your application.
Flush Inserts
 Direct Flue
Connection
with Cleanout
 Full Flue Liner
(No Cleanout Required)
  
     



The use of one of the connection methods listed
on this page not only increases the safety of your
insert by directing the hot gases up the ue, but
will also help increase the unit's efciency and
decrease creosote deposits in the chimney.
When a connected ue or liner is in use, the
insert is able to “breathe” better by allowing a
greater draft to be created. The greater draft can
decrease problems such as, difcult start-ups,
smoking out the door, and dirty glass.




 When installed in a factory built replace, a
full stainless steel rigid or exible ue liner
is mandatory, for both safety and perform-
ance purposes. When a ue or liner is in
use, the insert is able to breathe better by
allowing a greater draft to be created. The
greater draft can decrease problems such
as, difcult start-ups, smoking out the door,
and dirty glass.
 In order to position the ue liner, the exist-
ing rain cap must be removed from your
chimney system. In most cases the ue
damper should also be removed to allow
passage of the liner.
 In most cases opening the existing spark
screens fully should give enough room for
the insert installation. If it does not, remove
and store.
 If the oor of your replace is below the
level of the replace opening, adjust the
insert's levelling bolts to accommodate the
difference. When additional shimming is
required, use non-combustible masonry or
steel shims.
 Measure approximately the alignment of
the ue liner with the position of the smoke
outlet hole on the insert to check for pos-
sible offset. If an offset is required, use a
proper stainless steel unit available with the
chimney liner.
 Once the above items have been checked,
slide your insert into position after rst po-
sitioning the ue liner and offset if required.
(Re-install raincap at completion of installa-
tion).

    


