Installation manual

20
Regency Plateau™ PTO30 Outdoor Gas Fireplace
INSTALLATION
ASSEMBLY INSTRUCTIONS FOR A STEEL STUD
SEE THROUGH FRAMING KIT FOR PTO30
Follow these instructions to construct a steel stud see through frame for the PTO30 burner;
Overall dimensions =64-1/16" (1627mm) W x 51"(1295mm) H x 19" (483mm)D .
**Non-combustible fi nishing board not supplied with kit. Board may be purchased at your local hardware/building supply store.
IMPORTANT: Supplied vents need to be installed into non-combustible fi nishing board, before applying fi nishing materials. Follow guidelines
included with these instructions.
377-908 CONTENTS:
Top / Bottom (A) x 2
Vertical Supports - Tall (B) x 8
Vertical Supports - Short (C) x 6
Base (D) x 1
Short Brace (E) x 4
Header (F) x 2
Vents 4
Wafer Screws 80
Tools Required
1 power
drill
+ #2 phillips bit
1 hand
#2 screwdriver
(Phillips)
1 level
1
tape
measure
PTO30 BURNER MUST BE INSTALLED AT A MINIMUM OF 750MM ABOVE GROUND. IF INSTALLED LOWER, IT IS REQUIRED TO
INSTALL THE DECORATIVE GLASS SURROUND AND ENSURE MINIMUM HEIGHT IS 750MM TO TOP OF GLASS SURROUND.
IF INSTALLED LOWER THAN 750MM WITH GLASS SURROUND, INSTALLER MUST PROVIDE A MEANS OF SECONDARY GUARD,
NOT ATTACHED TO, BUT SURROUNDING THE PTO30 BURNER WITH A MINIMUM HEIGHT OF 750MM.
INSTALL ON 200MM (MINIMUM) MASONRY RISER OR SIMILAR; OR,
INSTALL ON 50MM (MINIMUM) MASONRY RISER OR SIMILAR WITH THE 'GLASS SURROUND.
NOTE: IF THE BURNER HAS BEEN
CONVERTED TO LPG, THE CYLINDER
CANNOT BE INSTALLED WITHIN
THE FRAMING KIT, AND MUST BE
CONNECTED VIA A PERMANENT
PIPING SYSTEM TO A REMOTE LPG
SUPPLY TANK