Installation Guide

Step 4. CONCRETE Wall Preparation
IF INSTALLING INTO DRYWALL – PLEASE PROCEED TO STEP 7.
Position the rail by measuring up from the door
height (H) + 1 3/4" to the centre of the track. Also ensure
a gap of 3/8" - 1/2" at the bottom. Ensure the rail is level and
leave a minimum of 2" from the end of the rail to the side
of the opening (as shown).
If installing with an opening for 80" standard door size,
remove the top trim and cut the side trim horizontally along
the height of the opening.
BARN DOOR HARDWARE KIT
STRAIGHT STRAP
BD100K-07800
INSTALLATION GUIDE
Step 5. CONCRETE Wall Preparation
Position the rail in place ensuring that it is level, mark the
holes on the rail using a pencil and pre-drill 5/16" holes
into the concrete.
Step 6. CONCRETE Rail Installation
When installing directly into concrete, insert using the
provided anchors and carriage bolts (with washers).
Ensure to un-screw to separate the carriage bolt and
anchor to install correctly, securing with a wrench.
Ensure to insert both stoppers either side of the rail inside
the rst hole.
Door Height + 1 3/4
"
3/8" (9.5mm) –
1/2" (12.7mm)
Gap under
the door
78 3/4" (2000mm)
Minimum
2"
(51mm)
1 3/8" (30mm)
5/16" (8mm)