Specifications

13B-25
DIESEL INJECTION
Injector rail: Removal - Refitting
K9K
13B
REMOVAL
I - REMOVAL PREPARATION OPERATION
a Disconnect the battery (see Battery: Removal - Re-
fitting) (80A, Battery).
a Remove the front engine cover.
a Remove the nuts (1) from the dipstick guide and
neck.
a Put the engine oil dipstick guide to one side (2) .
Equipment required
Diagnostic tool
Tightening torquesm
injector rail nuts 28 N.m
nuts of the neck and
dipstick guide on the
injector rail
21 N.m
IMPORTANT
To avoid all risk of damage to the systems, apply
the safety and cleanliness instructions and opera-
tion recommendations before carrying out any
repair (see Diesel injection: Precautions for the
repair) .
IMPORTANT
Before starting any work on the injection circuit, use
the Diagnostic tool to check:
- that the injector rail is not under pressure,
- that the fuel temperature is not too high.
It is essential to respect the safety and cleanliness
advice whenever work is carried out on this system.
Working on the circuit with the engine running is
strictly forbidden.
IMPORTANT
Wear leaktight gloves (Nitrile type) for this opera-
tion.
24733