Specifications

19A-13
COOLING
Coolant pump: Removal - Refitting
K9K, and 796
19A
REMOVAL
I - REMOVAL PREPARATION OPERATION
a Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
a Disconnect the battery (see Battery: Removal - Re-
fitting) (80A, Battery).
a Remove:
- the engine cover,
- the engine undertray bolts,
- the engine undertray.
a Remove the front bumper (see Front bumper: Re-
moval - Refitting) (55A, Exterior protection).
a Drain the cooling system (see 19A, Cooling, Cool-
ing system: Draining - Refilling, page 19A-6) .
a Remove:
- the accessories belt (see 11A, Top and front of
engine, Accessories belt: Removal - Refitting,
page 11A-2) ,
- the timing belt (see 11A, Top and front of engine,
Timing belt: Removal - Refitting, page 11A-17) .
a Disconnect the electrical connections from the alter-
nator.
a Remove the alternator upper bolt (1) .
a Loosen the alternator lower bolt.
a Tilt the alternator forward.
Tightening torquesm
bolts of the coolant
pump
10 N.m
inner timing cover bolts 9 N.m
alternator bolts 21 N.m
IMPORTANT
Wear leaktight gloves (Nitrile type) for this opera-
tion.
IMPORTANT
Wear heat protective gloves during the operation.
IMPORTANT
The circuits are designed to be pressurised, so be
careful at high temperatures (risk of serious burns).
Do not remove the cap from the expansion bottle
while the engine is hot.
Take care when carrying out a repair under the bon-
net, as the radiator fan(s) may start to operate with-
out warning.
Do not open the bleed screw(s) with the engine run-
ning.
WARNING
Prepare for the flow of fluid, and protect the sur-
rounding components.
102267