Specifications

19D-4
ENGINE MOUNTING
Right-hand suspended engine mounting: Removal - Refitting
K9K
19D
REMOVAL
I - REMOVAL PREPARATION OPERATION
a Remove the front engine cover.
a Fit the engine support tool (Mot. 1453) with the re-
taining belt, taking the timing end lifting eye as an
anchoring point.
a Disconnect the fuel pipe at (1) ,
a Insert the blanking plugs.
a Unclip the fuel pipes at (2) ,
a Move the fuel pipes aside.
Special tooling required
Mot. 1453 Engine anchorage support
with multiple adjustments and
retaining straps.
Tightening torquesm
right-hand suspended
engine mounting bolts
on the engine
62 N.m
right-hand suspended
engine mounting bolts
on the body
62 N.m
24764
146339