Full Product Manual

14
2. Check for Clearance—verify that there is sufficient room to run wires, as well as clearance
above and below the controller for ventilation. The clearance should be at least 6 inches (150mm).
3. Mark Holes
4. Drill Holes
5. Secure the charge controller.
The controller can be mounted using the existing mounting holes or using the included mounting
brackets.
6 inches
warm air
(150mm)
cool air
6 inches
(150mm)
Mounting Methods