Owner`s manual

Operator manual REX-***R(F)
LISTEM Corporation 71/90
4.3 Periodic Part Replacement
Major consumables and periodic part
replacement parts
Replacement cycle
1
X-ray tube Equipment 30,000 times check
2 Stand chain About 4 years
3
Hand switch 10,000 times or 3 years
4
Light lamp About 1 years
5
Stand wire About 4 years
6
Motor About 4 years
7
High electric pressure origination On/Off
switch
About 3 years
8
membrane About 2 years
9 Driving part belt About 2 years
Periodic part replacement estimation is minimum standard requirement to
maintain the performance of the equipment. It is not guarantee of the part.
Unexpected error or problem may occur when the parts are not replaced as
recommended. The users have responsibility for these matters.
- End-Users have responsibility of operation, repair and maintenance of medical
equipments.
- Do not operate the equipment without qualified personnel or under the supervision
of qualified personnel
- Internal repair and inspection may be dangerous. Please contact customer service
center for assistance