Service manual

39
Maintenance
To Remove Heat Exchanger
As each item is removed keep the relevant screws with that item
DRAWING F
1. . Remove assembly `A` (see Manifold & Burner Box Removal page 39)
2. Remove assembly `B` (see Fan Removal page 41)
DRAWING H
1. Disconnect Heat Exchanger Pipes, undo screws `A` from plates `1` and spin plates out of the
way and remove plates.
2. Pull the 2 cold feed pipes `2` from out of the by pass servo
3. Pull Hot feed pipe `3` from it`s housing.
4. Undo 2 PCB securing screws and pull out PCB and leave hanging picture H screws C
DRAWING G
1. Unclip anti frost heaters,items 1A,1B, 1C and leave hanging outside the case.
2. Unclip the Thermal link ,connection 6
3. Disconnect Heat Exchanger Thermistor, connection 7
4. Disconnect Sparker connection, connection 8
DRAWING F
1. Disconnect breather pipe from gas valve, item H
2. Undo screw below air box screw d
3. Undo 3 screws under fan bracket on base of heat exchanger, screws c
4. Undo 2 screws top left hand corner of heat exchanger, screws a
5. Whilst supporting heat exchanger assembly, remove 2 screws top right hand side of heat ex-
changer, screws b
6. Remove complete heat exchanger
7. Unclip remove over heat stat and thermal fuse from around heat exchanger, item F
8. Remove heat exchanger thermistor ensuring the `O` ring is not left in place, item E
9. Remove sparker from base of heat exchanger, item G
10. Undo screws from cover of air box, item H screws f
11. Remove side box and top of air box
12. Undo screws holding base of air box onto the top of the heat exchanger, screws e
To Rebuild New Heat Exchanger
Reverse the above instructions placing all components onto new heat exchanger.
NOTE
ENSURE NEW `O` RINGS SUPPLIED WITH NEW HEAT EXCHANGER
ARE FITTED ONTO THE PIPE see drawing H `O` rings `B`