Installation guide

Rinnai Continuous Flow Water Heating Specication Guide 02-13 | 33
Vertical straight flueing
For installations where the Rinnai Infinity needs to be flued vertically through the roof. Additional lengths of
FFSSPIPE1000 can be added as required (can be cut to size). Total flue length can be 15 m.
FFSSROOFCOWL
FFSSPIPE1000
FFSSCOND
To sanitary waste
A condensate drain is required for flue lengths over 1.5 m (excludes Rinnai Infinity EFi250).
Combination flueing - vertical and horizontal
Combination of both vertical and horizontal flueing. If starting horizontally and finishing horizontally then use
FFSSKIT as a starting point and customise with parts shown in the diagram below.
If starting horizontally and ending vertically or vise versa, individual flue components will need to be ordered.
Flueing MUST start with an FFSSBEND90 or FFSSPIPE1000 (can be cut to size).
FFSSROOFCOWL
FFSSPIPE1000
FFSSBEND90
FFSSPIPE1000
FFSSPIPE1000
FFSSBEND90
FFSSCOND
To sanitary waste
A condensate drain is required for flue lengths over 1.5 m (excludes Rinnai Infinity EFi250).