Instruction manual

4 IMR01Y06-E6
2. HANDLING PROCEDURES
Conduct the setting necessary for performing communication in accordance with the following
procedure.
To avoid error at operation start-up, COM-JC must be powered on LAST (after the
Controller, PLC, etc.).
Mounting
Install the COM-JC.
Refer to 3. MOUNTING (P. 5)
For controller, refer to FB100 Installation Manual
(IMR01W12-E) or FB400/FB900 Installation
Manual (IMR01W01-E)
COM-JC Setting
Wiring and
Connection
PLC and Controller
Settings
Device Assignment
Set the CC-Link station number, Communication speed and
Occupied station/Extended cyclic of COM-JC and Controller
communication speed.
Refer to 5. SETTING (P. 16)
Connect power supply wires to the COM-JC, and also connect
the COM-JC to the controller and the COM-JC to the PLC,
respectively.
Refer to 4. WIRING (P. 8)
For controller, refer to FB100 Installation Manual
(IMR01W12-E) or FB400/FB900 Installation
Manual (IMR01W01-E)
Set the PLC and controller.
Refer to 8.3 Use Instruments Setting (P. 83)
For controller, refer to FB100 Communication
Quick Manual (IMR01W15-E) or FB400/FB900
Communication Quick Manual (IMR01W07-E)
Do assignments of Remote input/output and Remote register.
Refer to 8.4 Device Assignments Example (P. 85)
Program Creation
Create the sequence program of PLC.
Refer to 8.5 Sample Program (P. 88)