Instruction manual

IMR01Y06-E6 81
8. USAGE EXAMPLE
This chapter describes a usage example of CC-Link communication.
8.1 Handling Procedures
To avoid error at operation start-up, COM-JC must be powered on LAST (after the
Controller, PLC, etc.).
Preparations of
Configuration Instrument
Mounting and Wiring
Use Instruments Setting
Refer to 8.2 System Configuration (P. 82)
Refer to 5. SETTING (P. 16) and 8.3 Use Instruments
Setting (P. 83).
Device Assignments
Refer to 8.4 Device Assignments Example (P. 85).
Program Creation
Refer to 8.5 Sample Program (P. 88).
For cable wiring of CC-Link network system,
refer to Instruction Manual of master instrument or
website of CC-Link Partner Association.
http://www.cc-link.org/
For mounting and wiring of the COM-JC, refer to
3. MOUNTING (P. 5) and 4. WIRING (P. 8).
For mounting and wiring of the controller (FB400),
refer to FB400/FB900 Installation Manual
(IMR01W01-E).
For mounting and wiring of PLC, refer to PLC
Instruction Manual.