Technical data

Manual
Double Sheet Detector R1000 series E20
Electrical installation
B0046991 / Rev. 1.6
74
ROLAND ELECTRONIC GmbH · Otto-Maurer-Str. 17 · DE 75210 Keltern · Phone +49 (0)7236-9392-0 · Fax +49 (0)7236-9392-33
5.5 Cable connections
The cable is connected via PG-glands (in case of the sensor cable special EMI PG-glands) and
internal plug-in terminals inside the control unit. The front cover with the complete electronics can
be removed after loosening the plug terminal blocks inside. This enables the exchange of control
units without disconnecting the cables.
5.5.1 PLC cable
The connection of the cable shield should be one sided at the systems common of the PLC only
(compare connection diagram PLC cable, see chapter “5.4 Wiring diagrams and pin
configurations“).
5.5.2 Voltage supply cable
The voltage supply cable should be kept short. Up to 20 m length use cable leads with 2 x 1 mm²
cross-section. For larger lengths the cross section should be increased.
Pos: 43 /Doppel blech/Geräte/E2 0/5 Elektrisc he Installation/A nschluss P-Sens oren und S ensorkabel @ 1\ mod_1193059 331000_501.d oc @ 5134 @ 2 33 @ 1