Installation & Assembly

161019ronbow.eu | ronbow.comINSTALLATION SHEET
2
VENTO 40” Vertical Wall Cabinet
Model :
E097014
Designed By: PININFARINA | ITALY
Figure 1.
Figure 2.
Step 2:
Drill pilot holes where the top wall
cleat will go. Measure 29-3/4” (75.5cm)
from each pilot hole down and mark
the location of the pilot holes for the
bottom wall cleat.
Make sure the pilot holes are level.
Step 3:
Secure each wall cleat to the wall with
the screws provided.
Step 4:
Secure the cleat in the back of the
cabinet to the wall cleat.
Check if the wall cabinet is level.
INSTALLATION
Step 1:
Determine the ideal location of your
new wall cabinet.
NOTE: The location should have at
least 2 studs available. Front notch the
studs to fit 2x4 beams that will provide
stability for the wall cleats.
See Figure 1.
See Figure 2.
29-3/4” (75.5cm)