Assembly Instructions

Thank you for purchasing this quality product.Be sure to check all packaging material
carefully for small parts that may have come loose inside the carton during shipment.
HARDWARE LIST:
Flat Washer
Lock Washer
Allen Key M5
Flat Washer
(small)
Hex Nut
JCBB Bolt
Wrench
4pcs
8 pcs
4 pcs
1 pc
1 pc
4 pcs
4 pcs
PART NO
FIGURE
DESCRIPTION
QTY
Apron Hinge
Table Top
Glides
Apron Leaf
Leaf Hinge
Support Leaf
Hinge
Table Hook
1 pce
4 pcs
4 pcs
2 pcs
2 pcs
2 pcs
3 pcs
1
2
3
4
5
6
7
Hardware Bag
1 pce
PART NO
FIGURE
DESCRIPTION
QTY
This product will take 15-20
minutes to assemble.
Reminders
1.Use only the hardware supplied.
2.Once the product is assemble,level and tighten all the bolts.
3.Do not over-tighten bolts.
4.This item may require periodic tightening
NOTE:
1.Two or two people are needed for assembly
2 please keep all hardware parts out of the reach of children.
Leg Stretcher
Cover Piece
Mounting Plate
Adjustable
Leveler
Trestle
PART NO
FIGURE
DESCRIPTION
QTY
1 pce
2 pcs
2 pcs
2 pcs
4 pcs
COMPONENT LIST
COMPONENT LIST
Page 1 of 3
MADE IN MALAYSIA

Summary of content (3 pages)