Installation Procedure
Instruction for installation and operation
You should install the DPM according to the above
installation specification and eliminate the factors
that give electrical load to the both indoor units when
installing and operating. (Heater / window / front
door / ventilation / partition that divides space)
You should provide sufficient instructions about the
operation method and specification features to users
and fill in caution phrases on wired remote controller
when necessary.
<The air-conditioners in this area are special type
to be controlled simultaneously.>
Set up indoor quantity by key switch(K1, K2)
Press and hold K1 switch to enter the setting mode
on the number of the installed indoor unit : Check
A0” sign on 7-segment
Press K2 switch to set the number of the installed
indoor unit :
Ex) If there are two indoor units, press K2 switch
twice, and check "A2" sign on 7-segment.
If there are three indoor units, press K2 switch
three times, and check "A3" sign on 7-segment.
If there are four indoor units, press K2 switch
four times, and check "A4" sign on 7-segment.
Press K1 switch to complete setting the number
of the installed indoor unit : Check "AA" sign on
7-segment.
Step 10 Performing the gas leak test
LEAK TEST WITH NITROGEN (before opening valves)
In order to detect basic refrigerant leaks, before
recreating the vacuum and recirculating the R-410A, it is
the responsibility of the installer to pressurize the whole
system with nitrogen (using a cylinder with pressure
reducer) at a pressure Above 0.2MPa, less than 4MPa
(gauge).
LEAK TEST WITH R-410A (after opening valves)
Before opening valves, discharge all the nitrogen into
the system and create vacuum. After opening valves
check leaks using a leak detector for refrigerant R-410A.
Once you have completed all the connections, check for
possible leaks using leak detector specifically designed
for HFC refrigerants.