Use and Care Guide

Table Of Contents
Use as directed. To ensure proper performance, please be sure to contact us if you have installation or operation questions.
ENVIROLET®/SG INSTALLATION & OPERATION MANUAL (7MINS11D 12.15) • Envirolet® is a registered trademark. ©2016, Sancor Industries Ltd.
22
5. Attach Union Coupling (Optional)
The optional Union Coupling will allow for quick disconnection of your vent system for convenient servicing, if required, of either your
Envirolet®/SG system or the “Works-in-a-Drawer” electrical service compartment.
A. Use the Union Coupling provided (optionally) to join securely the 3”/75mm Vent Connection on the Envirolet®/SG
system to the “first” section of 3”/75mm White Pipe installed on your vent installation.
B. Insert both ends of 3” connections securely into Union Coupling and use a ¼ socket wrench or flat head
screwdriver to tighten bolts on Union Coupling and to secure sealed vent connection.
6. Connect Remaining Vent Pipe
A. Securely connect any remaining 3”/75mm White Pipe, using the 3”/75mm Couplings provided (cut 3”/75mm White
Pipe to size, if necessary).
B. Seal securely with silicone sealant (not Union Coupling) around all 3”/75mm Coupling connections to prevent any air
leakage (odour) .
7. Install Drain
IMPORTANT
If your system has a drain it must be connected.
Non-Electric and 12VDC Models
Non-Electric and 12VDC models are fitted with an excess liquid drain that must be connected to a proper drain site.
AC Electric Models
120V and 230V AC models do not require a drain, in most applications in normal operating conditions. In order to operate without a
drain, be sure to operate Fans and Heater as directed. A drain can optionally be fitted with a drain if heavy use or frequent power
outages are expected.
A. Connect one side of “T” portion of quick connect breather “T” to 13mm/1/2” drain (152cm/5’ included standard) line
that exits compost system (right-hand side when facing tank).
B. Important: Make sure open part of “T” (middle) is facing up to prevent air-lock.
C. Connect other side of “T” to length of 13mm/1/2” drain line.
D. Place end of drain line to acceptable drain site (leach field, holding tank, etc.). Make sure there is a gravity drop the
entire path from composting tank drain exit to drain site.
E. Insulate drain line if there is a chance of freezing.
IMPORTANT
Please be sure to connect excess fluid drain to an acceptable drain site, according to local regulations.
8. Seal All Vent Connections
Double check that all vent connections are thoroughly sealed with silicone sealant. This is an important step because it will help
prevent any odour leakage. Even a small hole (pin hole) can lead to odour escape, so please double check.
9. Insulate Exposed Pipe
Insulate any exposed 3/75mm Vent Pipe in attic, walls, outside, cold air space, etc. to prevent condensation and liquid build-up in
your System. Failure to properly insulate exposed vent pipe will cause improper operation of system.
10. Attach Wind Turbine Ventilator
1. Attach 4”/100mm Wind Turbine Ventilator* to the top of to the top of the Insulated Roof Stack.
2. Secure the Wind Turbine with silicone sealant and at least 3-4 tapping screws (not supplied).
IMPORTANT
Extend the 100mm/4” rigid vent pipe higher than 0.9m/3’ minimum for any installation surrounded by high trees, hills, other structures
and/or with a high roof peak and/or located in a valley.