Technical data

16
REPLACEMENT OF PARTS
nection cover to PCB cover, see diagram 21.
Open cover and unclip plastic clip securing
pump cable to lower front panel.
Pull off pump connector and earth lead.
Undo and remove four screws securing PCB
cover to lower front panel.
Lift off PCB cover.
Pull off connectors CN6, CN7, CN8 and CN9 on
PCB.
Undo and remove screw holding PCB to lower
front panel.
Lifting PCB up slightly on LHS, pull PCB out of elec-
trical connector on ignition PCB. Leave ignition PCB
in place.
Fit replacement PCB in reverse order to removal.
Important: When fitting replacement PCB, ensure
that control knob spindle correctly locates into PCB
adjuster slots.
Refit connectors and covers in reverse order to
removal.
To replace ignition PCB
Gain access to PCB's as described in previous
section.
Remove main PCB securing screw as described
in previous section.
Pull off three electrical connectors on PCB.
Lift up ignition PCB, separate from main PCB and
remove from boiler.
Fit replacement PCB in reverse order to removal.
Refit connectors and covers in reverse order to
removal.
To replace pump
Drain down heating circuit of boiler only as fol-
lows:
Sch 228
Hab 286
To replace microswitch assembly
Disconnect microswitch by pulling off plug.
Unclip external controls connector from mount-
ing bracket.
Undo two screws securing microswitch assembly
to reversing valve assembly, see diagram 20.
Remove microswitch assembly from reversing
valve.
Fit replacement microswitch assembly in reverse
order to removal.
Reconnect plug and refit external controls con-
nection to bracket.
To replace fan
Disconnect power supply and earth leads to fan.
Unscrew and remove two fan retaining screws
located at front edge of fan mounting plate.
Remove fan with mounting plate attached by
pulling forwards and out of boiler.
Unscrew and remove three screws securing fan
to fan mounting plate.
Fit replacement fan to mounting plate and se-
cure with screws.
Fit replacement fan to boiler in reverse order to
removal making sure that mounting plate retain-
ing lugs are properly engaged into flue hood.
Reconnect power supply and earth leads.
Important: Make sure that fan outlet is correctly fit-
ted into the flue elbow at the top of the boiler.
Before commissioning boiler, remove the two plas-
tic transit clips from replacement fan.
To replace air pressure switch
Locate air pressure switch in upper left hand cor-
ner of sealed chamber.
Pull off plastic tube from left hand connection.
Grasp pressure switch and disengage it from
bracket clips by pulling from the top.
Remove electrical connections from switch.
Fit electrical connections to terminals 1 and 3 of
replacement switch.
Fit replacement switch in reverse order to re-
moval.
Important: Refit plastic tube to LEFT hand connec-
tor (marked P1).
To replace spark generator
Locate spark generator on bracket to right hand
side of gas valve.
Undo and remove screw securing lower termi-
nal cover to bracket and remove bracket.
Disconnect four leads from spark generator.
Undo and remove screw securing spark genera-
tor to bracket and remove spark generator.
Fit replacement spark generator in reverse order
to removal.
Reconnect two grey power supply leads and two
clear ignition leads to spark generator, the polarity
is not important.
Refit lower terminal cover.
To replace main printed circuit board (PCB)
With lower front panel down as described previ-
ously, undo and remove screw holding pump con-
Diagram 20
Diagram 21
SERVICING INSTRUCTIONS