Operating instructions

13
BOILER INSTALLATION
Statutory requirements
The installation of this boiler must be carried out by
a competent person in accordance with the rel-
evant requirements of the current issue of:
The Gas Safety (Installation and Use) Regulations
The Building Regulations
The local water company Byelaws
The Building Standards Regulations (Scotland)
The Health and Safety at Work Act
Sheet metal parts
WARNING. When installing or servicing this boiler,
care should be taken when handling the edges of
sheet metal parts to avoid the possibility of personal
injury.
Installing the boiler
Prior to starting work, the system must be thoroughly
flushed so as to eliminate any foreign bodies and
contaminants such as filings, solder particles, oil,
grease etc.
Note. Solvent products could cause damage to the
system.
Engage boiler upper part onto the hanging
bracket.
Allow the boiler to seat down onto support plate.
Fit filter and washers, strictly adhering to the se-
quential order and directions shown on diag. 6
(Ecosy 24 E/28 E) or diag. 7 (Ecosy SB 24 E/SB 28 E).
Connect the various couplings between boiler
and connection plate.
Fit water trap supplied (diagram 11) to the con-
dense outlet located underneath and to the left rear
of the boiler. The outlet of the trap must then be
connected to the household drainage system via
a suitable water trap, such as a washing machine
type trap.
BEFORE STARTING THE BOILER, THE TRAP MUST BE
FILLED WITH WATER.
Hab 212a
Ins 030
Diagram 11
Hose to be connected to
a drain
201,5
201,5
227
120
227
120
Ø 80
Ø 80
Diagram 12