Technical data

22
4000123924-2
10 Horizontal Rear Flue Installation
Diagram 10.8
9741
EARTH
LEAD
FAN RETAINING
SCREWS
POWER
SUPPLY
LEADS
(F30E/F30E SB shown)
Preparing the boiler
• Lift the boiler up and engage boiler upper part onto the
hanging bracket.
• Fit the washers between the boiler pipes and the inlet and
outlet fittings on the fixing jig and connect the various couplings
between the boiler and jig.
Now the boiler is on the wall, slide forward the adaptor about
20mm. secure it on to the back of the boiler with the two screws
supplied in the fittings kit, see diagram 10.7.
Flue Hood Outlet Restrictor, refer to diagram 10.9
(for F 35 Eonly)
Secure restrictor, supplied with flue pack, to the flue hood
as shown in diagram 10.9.
Restrictor, refer to diagram 10.6
For flue systems less than 0.5m long, fit the flue restrictor
supplied in document envelope into the fan outlet (F30 E/F
30 E SB only), see diagram 10.6.
Fan Securing, refer to diagram 10.8
Ensure fan outlet seal is in position, see diagram 10.8, then
fit the fan into the flue duct and secure to the flue collector
with screws previously removed.
Replace chamber cover and secure with screws previously
removed.
10316
Diagram 10.9
RESTRICTOR
(F 35 Eonly)
FLUE
HOOD