Operation Manual
BASCP_EN
V03 | 08.2012
25
www.schaerer.comOperation
► Place the milk container into the cooling unit.
► Hang the hose or hoses into the container.
The hose end must be in contact with the container floor.
► Close the door.
Option 3: Under-machine cooling unit
► Open the door.
► Remove and rinse the milk container.
► Fill in fresh, pre-cooled milk (3 – 5°C).
► Place the milk container into the cooling unit.
► Hang the hose into the container.
The hose end must be in contact with the container floor.
► Close the door.
Dispensing
Adjusting the cup grate
When filling large containers, such as a latte macchiato glass, the adjustable cup grid must be
moved to the right:
► Grip the cup grid, move it to the right and let it engage.
► Place the cup on the cup grid of the drip tray.
Beverages
► Place a cup under the beverage outlet.
CAUTION!
Hot fluid!
► Press the required beverage button.
The progress of the beverage dispensing will be shown on the main screen.
► Remove the cup after the beverage has been dispensed.
Double beverage
Double dispensing of a beverage for pure coffee beverages. When dispensing double bever-
ages, position the cups or glasses properly under the beverage outlet:
Ensure that the filled milk does not touch the closed milk container lid.
See "Dispensing options" - "Stop dispensing" to stop dispensing of the beverage.