User`s manual

Software Configuration Examples
02/2005 47
Result Your system is now working.
If you encounter any problems proceed with Steps to Check When Not Running,
p. 48.
8 Run the PLC.
Result: PLC and network should be in RUN state.
Unity configurator window without an error (no red fields):
Front plate of PBY 100:
Step Action
These two LEDs must be green
This LED must blinking green