Installation Manual

Installation
1–28 975-0639-01-01 Rev D
This guide for use by qualified personnel only
Figure 1-14 Conext SW BTS and Xanbus Connections
Battery
Negative
Battery
Positive
Xanbus Stacking REM BTS
/
(1) Install the BTS sensor on the
battery.
Method (a) involves mounting the
sensor to the negative battery post
which allows the internal battery
temperature to be sensed providing
the most accurate results.
Method
(b) attaches the sensor to the
side of the battery using the self-
adhesive backing which also
provides good results in most
situations.
(2) Plug the BTS connector to the BTS
port of the inverter/charger.
(2)
(1)(a)
(1)(b)
(3)
(c)
BTS
battery cable
battery terminal
(3) Connect the Xanbus-enabled devices
using the provided network cable. Terminate
each end of the network with a network
terminator
(c) and (d).
(d)
WARNING
FIRE HAZARD
Follow the stacking of wires as shown in 1(a) of the illustration below.
Failure to follow these instructions can result in death or serious injury.
ConextSW-NA-InstallationGuide.book Page 28 Tuesday, July 21, 2015 4:39 PM