Installation Manual

Wiring the Conext XW+ and Conext XW+ PDP
3–56 975-0239-01-01 Rev J
This manual is for use by qualified personnel only
Before installing a three-phase system, disconnect all power from the system.
Depending on your installation, you will need to perform the following
pre-installation steps:
1. Convert each 120 V/240 V, three-wire, split-phase Conext XW+ model to
single-phase. For more information, see Appendix C, “Split-Phase to
Single-Phase Conversion Instructions”.
2. Wall-mount Conext XW+ Inverter/Chargers and PDP. See “Wall-Mounting the
Conext XW+ and PDP” on page 2–9.
3. Install Conext XW+ Conduit Box as needed. See “Installing the Conext XW+
Conduit Box” on page 2–10.
4. Install AC sync and Xanbus cable(s) as needed. See “Installing AC sync and
Xanbus cables” on page 4–5.
5. Remove knockouts on the PDP as needed to accommodate the wiring. See
“Knockout Selection” on page 2–4 for more information about knockouts.
Conext XW+ Inverter/Charger Grounding
The Conext XW+ is provided with ground terminals that must be reliably
connected to ground (protective earth) by appropriately sized equipment
grounding conductors. System grounding for the AC and DC systems must be
done according to all applicable NEC and local installation codes.
For more information about system grounding, see “Grounding the DC System”
on page 3–8 and “AC Equipment Grounding” on page 3–20.
WARNING
UNGROUNDED EQUIPMENT
Equipment ground terminals must be reliably connected to ground by
appropriately sized grounding conductors. All installations must comply with
national and local codes. Consult local and national codes for specific
grounding and bonding requirements.
Failure to follow these instructions can result in death or serious injury.