Installation Manual

Conext System Control Panel Installation
975-0239-01-01 Rev J 5–7
This manual is for use by qualified personnel only
4. Secure the SCP with the four screws removed from the inverter information
panel.
5. When all wiring is complete, re-secure the AC access panel to the Conext
XW+ chassis For more information, see “Removing the AC Access Panel and
PDP Internal Faceplates” on page 3–2.
For more information about the Conext System Control Panel, see the Conext
XW+ Inverter/Charger Operation Guide.
Verifying the Installation
If network power (from an inverter/charger) is present, the SCP backlight will
illuminate and the startup screen will appear, followed by the system Home
screen. For more information, see the Conext XW+ Inverter/Charger Owner’s
Guide.
Figure 5-4 Mounting plate centered on wall studs
XW-NA-Install.book Page 7 Wednesday, August 12, 2015 2:23 PM