Installation Manual

Pre-Installation and Wall-Mounting
2–2 975-0239-01-01 Rev J
This manual is for use by qualified personnel only
Pre-Installation
Before installing the Conext XW+ Inverter/Charger, read all instructions and
cautionary markings in this Guide.
Planning the Installation
Read this entire chapter before beginning the installation. It is important to
plan the installation from beginning to end.
Assemble all tools and materials needed for the installation.
Installation Tools and Materials
To complete the installation, you will need the following tools:
Socket wrench, appropriately sized
Phillips head screwdriver, appropriately sized
Level
Depending on your installation, additional hardware may be required.The
following items are not included with the Conext XW+ Inverter/Charger:
Battery cables
Grounding wire: #14 AWG to #2 AWG (1.63mm to 6.54mm)
Lag bolts to secure the mounting plates
Screws for mounting the Conduit Box
Additional wiring to connect the PDP to the inverter load sub-panel and utility
grid
Appropriate materials and hardware for additional wall-mount support
Note: Obtain all necessary permits prior to starting the installation. Installations
must meet all local codes and standards. Installation of this equipment
should only be performed by skilled personnel such as qualified electricians and
Certified Renewable Energy (RE) System installers.
WARNING
HEAVY EQUIPMENT
The Conext XW+ Inverter/Charger weighs approximately 120 lbs. (54 kg). A
two-person lift is required. To prevent personal injury, always use proper lifting
techniques during installation.
Failure to follow these instructions can result in death or serious injury.
XW-NA-Install.book Page 2 Wednesday, August 12, 2015 2:23 PM