Installation Manual

Pre-Installation and Wall-Mounting
2–10 975-0239-01-01 Rev J
This manual is for use by qualified personnel only
2. Lower the Conext XW+ chassis flange onto the mounting plate.
3. Secure the bracket at the top of the Conext XW+ chassis with two #10
self-tapping screws (included).
4. Wall-mount the PDP and any additional Conext XW+ Inverter/Chargers using
the same procedure shown in steps 1-3 (above).
Installation tip The PDP is designed to mount on the right side of the inverter/charger, but it can
be configured to mount on the left side instead. For more information, see the
Conext XW+ Power Distribution Panel Installation Guide.
Installing the Conext XW+ Conduit Box
The Conext XW+ Conduit Box is divided into two parts: the rear panel and the
front panel.
To secure the Conduit Box to the Conext XW+ chassis:
1. Remove both #10 screws from the bottom of the Conext XW+ chassis.
2. Find the keyhole slots located under the top of the rear panel.
3. Align the keyhole slots on the top panel of the Conduit Box with the
corresponding #10 screws on the bottom of the inverter.
4. Secure the Conduit Box to the inverter with the both #10 screws.
Figure 2-8 Conduit Box keyhole alignment
XW-NA-Install.book Page 10 Wednesday, August 12, 2015 2:23 PM