Installation Manual

Wiring the Conext XW+ and Conext XW+ PDP
3–24 975-0239-01-01 Rev J
This manual is for use by qualified personnel only
Wiring the Conext XW+ Power Distribution Panel to a Generator (On-Grid)
In an on-grid installation, the generator will require an additional 60 A, 120/240
VAC, two-pole, type QOU AC breaker to be installed in the Conext XW+ Power
Distribution Panel.
Figure 3-13 Wiring the Conext XW+ Power Distribution Panel to a Generator (On-Grid)
AC INAC OU T AC IN
GRID
(AC1)
AC
LOAD
GEN
(AC2)
NL1L2NL1L2NL1 L2
1
1. AC generator Cable routing may vary. See Knockout Selection
on page 2-5 and Communications Network
Preparation on page 2-12. For torque values, see
page 2-16 and 2-17.
LEGEND
Grounding
wire
Neutral
Hot L1
Hot L2
XW-NA-Install.book Page 24 Wednesday, August 12, 2015 2:23 PM