Installation Manual

Wiring the Conext XW+ Inverter/Charger with a PDP
975-0239-01-01 Rev J 3–25
This manual is for use by qualified personnel only
Wiring the Conext XW+ Power Distribution Panel to a Generator (Off-Grid)
In an off-grid installation, the generator can be connected to the breakers
provided in the PDP. No additional breaker is required.
Figure 3-14 Wiring the PDP to a Generator (Off Grid)
AC INAC OUT AC IN
GRID
(AC1)
AC
LOAD
GEN
(AC2)
NL1L2NL1L2NL1 L2
1
1. AC generator Actual wiring requirements may vary.
Cable routing may vary. See Knockout Selection
on page 2-5 and Communications Network
Preparation on page 2-12.
For torque values, see page 2-16 and 2-17.
LEGEND
Grounding
wire
Neutral
Hot L1
Hot L2
XW-NA-Install.book Page 25 Wednesday, August 12, 2015 2:23 PM