Installation Manual

Wiring the Conext XW+ and Conext XW+ PDP
3–34 975-0239-01-01 Rev J
This manual is for use by qualified personnel only
This completes the functional test. If any of the internal set points need to be
adjusted on the Conext XW+, consult the configuration chapter of the Conext
XW+ Inverter/Charger Owner’s Guide.
Figure 3-21 Checking Charging Operation
Note: Unless the inverter/charger settings have been changed, the inverter will
charge as if it has a large (> 440 Ah) flooded battery bank (factory default
setting). In newly installed systems, adjust the battery charging set points to
match the batteries as installed.
Amp LED
XW-NA-Install.book Page 34 Wednesday, August 12, 2015 2:23 PM